| Date |
Description |
| 29/11/2010 |
- Modify battery test rig for new batteries. (DD,TA,TB)
- Look at new batteries and design and make new battery boxes, trolley etc as needed. (BM,IM)
- VWT tests of performance ideas. (GB)
- Car horn. (GB,DD)
- Make Video, sponsor letters and noticeborad improvements. (DB)
- Look at options to improve seat arrangements for new shorter drivers with better anti-submarining support. (LB,SD,DD,TB)
- Write Thankyou letter to all sponsors. (LB,TA)
- More sponsorship (Townsland trust etc) and/or Morrisons bag packing. (BM,TA)
|
| 10/1/2011 |
- Generally look at what we need to do
|
| 17/1/2011 |
- Design new rear end and start making if there is time. (DD,GB,MD)
- Look at seating with LB,DB,SD. Decide method. (LB,DB,SD,TB)
- Battery fitting. (Look at sizes needed, foam, connectors etc) (BM,IM)
- Measure joystick tube. Look at throttle mech and choose which one to buy. (TA,KA)
- Edit the Todo list and add all Monday night dates, holidays and race days. (DB,SD,LB)
- New messaging system over telemetry including Panic button for driver. What messages, how to work. (TA,KA)
- Put foam pannels on roof of lockup. (Tall ones !)
|
| 24/1/2011 |
- Design new rear end and start making if there is time. (SD,GB,MD)
- Look at seating with LB,DB,SD. Decide method. (DD,LB,DB,TB)
- Battery fitting. (Look at connectors connectors etc) (BM,IM)
- Look at throttle mech and choose which one to buy. (TA,KA)
- New messaging system over telemetry including Panic button for driver. What messages, how to work. (TA,KA)
- Put foam panels on roof of lockup. (Tall ones !)
- Car horn. (GB,DD)
- Maintain school display board.
- Produce Graphs of battery data (discharge curves (voltage) over time with one curve per temperature).
|
| 31/1/2011 |
- Make new rear end. (SD,DB,MD)
- Look at seating with LB,DB,SD. Decide method. (DD,LB,DB,TB)
- Battery fitting. (BM,IM)
- Car horn. (GB,DD)
- Put foam panels on roof of lockup. (Tall ones !)
- Maintain school display board.
- Produce Graphs of battery data (discharge curves (voltage) over time with one curve per temperature).
- Work out gearing required for new batteries.
|
| 7/2/2011 |
- Fit new throttle mech. (TA,KA)
- New messaging system over telemetry including Panic button for driver. What messages, how to work. (TA,KA)
- Calibrate Meter to make sure current measurement is accurate.
|
| 14/2/2011 |
- Make new rear end. (SD,TA,MD)
- Wind Tunnel (GB)
- New joystick (TB,DB,LB,KA)
|
| 21/2/2011 |
holiday |
| 28/2/2011 |
- Make new rear end. (SD,TA,MD)
- Wind Tunnel (GB)
- New joystick (TB,DB,LB,KA)
|
| 7/3/2011 |
- Make new rear end. (SD,TA,MD)
- Battery cables. (BM,IM)
- Brake light (GB,DD,TA)
- Car horn. (GB,DD)
- Work out gearing required for new batteries. (DB,LB)
- New joystick (TB,DB,LB,KA)
|
| 14/3/2011 |
- Make new rear end. (SD,TA,MD)
- Battery cables. (BM,IM)
- Brake light plug and socket (GB,DD,TA)
- Car horn. (GB,DD)
- Work out gearing required for new batteries. (DB,LB)
- New joystick (TB,DB,LB,KA)
|
| 21/3/2011 |
- Make new rear end. (SD,TA,MD)
- Battery cables. (BM,IM)
- Car horn. (GB,DD)
- New joystick (TB,DB,LB,KA)
|
| 28/3/2011 |
- Finish off rear end. (SD,TA,MD)
- Car horn. (GB,DD)
- New joystick (TB,DB,LB,KA)
|
| 4/4/2011 |
Test day at Goodwood
- Test car
- Pit stop practice
|
| 11/4/2011 |
holiday |
| 18/4/2011 |
holiday |
| 25/4/2011 |
holiday |
| 1/5/2011 |
Coorporate Challendge |
| 2/5/2011 |
holiday |
| 9/5/2011 |
- Short! Meeting
- Make new joystick. Lathe down bar, grove bar and shape were handle fits. (TB,DB,LB,KA)
- Look at 5/6 point harnesses
- Real Wind Tunnel
- Finish other battery box (insulation ?)
- Get Joystick bits welded
|
| 16/5/2011 |
- Fit new Joystick
- Older drivers train newer drivers
- Real Wind Tunnel
- Look at improving laptop display and car computer battery charge algorithms.
- Shorten the trestles
|
| 23/5/2011 |
- Fit new Joystick
- Fit harness
- Older drivers train newer drivers
- Real Wind Tunnel
- Improve trailer mounts
|
| 6/6/2011 |
- Fit harness
- Finish off car
- Practice pit stops
|
| 12/6/2011 |
Goodwood |
| 13/6/2011 |
- Dry out electronics
- Get GPS working
- Update school notice board
- Write up race reports
- Real Tunnel Work
|
| 20/6/2011 |
- Pitstop practice
- Tidy up lockup
|
| 26/6/2011 |
Dunsfold |
| 27/6/2011 |
- Tidy up Greenpower room area.
- Write up race reports
- Real Tunnel Work
|
| 4/7/2011 |
holiday |
| 11/7/2011 |
- Make behind brake light fairing.
- Make up small battery box warming pad.
- Modify harness to allow tightning a bit more.
- Adjust seat.
- Write up race reports
- Real Tunnel Work
|
| 18/7/2011 |
- Make behind brake light fairing.
- Make up small battery box warming pad.
- Real Tunnel Work
|
| 25/7/2011 |
holiday |
| 1/8/2011 |
holiday |
| 8/8/2011 |
holiday |
| 15/8/2011 |
holiday |
| 22/8/2011 |
holiday |
| 29/8/2011 |
holiday |
| 5/9/2011 |
|
| 12/9/2011 |
- Pitstop practice
- Change Tyres
|
| 17/9/2011 |
Merryfield |
| 19/9/2011 |
- Take car apart and cehck things over.
|
| 26/9/2011 |
- Re-fit fixed seat and replace sides
- Fit new car horn
- Re-fit cleaned chain and set gearing for 18 tooth front cog.
- Fit battery selection switch
- Look at making up rear end fairing
- Fit new car horn battery box
- Drivers look at race circuit and decide race order
- Pitstop practice
- Change Tyres
|
| 2/10/2011 |
Castle Coombe |
| 3/10/2011 |
- Making up rear end fairing
- Repairing seat.
- Car horn new tunes.
|
| 10/10/2011 |
- Pitstop practice.
- New wind tunnel testing.
- Driver and race strategy for final.
|
| 16/10/2011 |
Goodwood final |