Rotary Racer 8, Renovatio: Todo List 2009 - 2010

Ideas for improvements to existing car

Priority 1

Priority 2

Priority 3

Ideas

Possible Aerodynamics improvements:

ToDecide

The Plan

Date Description
2009-12-01
  • Meeting on what to do
  • Atkins visit ? 
 2009-12-08
  • Decide order of job leader. (Tom first)
  • Decide on Team Captain. (James)
  • Add air vents to lockup to save rust.
  • Update the story / notice board. DB,TA
  • Check Frame alignment. 
2009-12-15
  • Remove motor
  • Remove rear subrame
  • Paint steel subframes / parts
2010-01-19
  • Fix battery testing board. New bulbs.
  • Start building new telemetry aerial mount.
  • Pictures on notice board and start adding history to website.
  • Car horn amplifier research.
2010-01-26
  • Telemetry aerial mount.
  • Replace painted rear subframe and wheels
  • VWT aerodynamics research. GB
  • Look at brakes.
  • Test RR7 battery (has had megapulse on it). TB
  • Start replacing wheel coverings.
  • Coat shaped foam with firbreglass resin and epoxy perhaps with fibreglass tissue.
  • Build battery pulser PCB.
2010-02-02
  • Telemetry aerial mount.
  • VWT aerodynamics research. GB
  • Look at brakes.
  • Replacing wheel coverings.
  • Coat shaped foam with firbreglass resin and epoxy perhaps with fibreglass tissue.
  • Build battery pulser PCB.
2010-02-09  
  • finish Telemetry aerial mount.
  • VWT aerodynamics research. GB
  • remove steering and paint
  • Replacing wheel coverings.
  • Coat shaped foam with firbreglass resin and epoxy perhaps with fibreglass tissue.
  • Build box for battery pulser PCB.
  • reserch how to manage speed
  • try using glass fible with undercoat on foam.
2010-02-16  Half Term Holiday
2010-02-23  
  • finish Telemetry aerial mount.
  • VWT aerodynamics research. GB
  • replace steering in car and level out for improved brakes
  • Replacing wheel coverings.
  • Build box for battery pulser PCB.
  • reserch how to manage speed
  • try using glass fible with undercoat on foam.
  • rotary club talk
2010-03-02  
  • finish Telemetry aerial mount.
  • VWT aerodynamics research. GB
  • finish replaceing steering in car and level out for improved brakes
  • Replacing wheel coverings.
  • Build box for battery pulser PCB.
  • reserch how to manage speed
  • try using glass fible with undercoat on foam.
  • rotary club talk
  • fit the new motor, and need to make up tempreture sensor
  • get funds /sponsorship
2010-03-09

 

2010-03-16
  • Continue working on wheel covers
  • Wire up brakes
  • Check if the wheels lock up
  • Fit the motor
  • Possible test run?
  • Decide on "renovatio" stickers
  • Make amplifier for car horn.
2010-03-23
  • Fit brake discs to front wheels
  • continue with amplifier
  • Put rear sprocket on back wheel
  • Put heat sink grease on the motor to the mounting plate
  • Fit the Motor
  • Fit the chain/sprocket (on the motor)
  • Wire motor
  • connect front brakes
  • test brakes are balanced
  • glue thermostat sensor to the motor
2010-03-30
  • Fit the Motor
  • Fit the chain/sprocket (on the motor)
  • Wire motor
  • Adjust brakes
  • Add average speed software
2010-04-06  Easter Holiday
2010-04-13  Easter Holiday
2010-04-20
  • Safety checks
  • Test around tennis courts
  • Kit check
  • Pit-stop practice
  • Driver check/ logbooks/ overalls fit
2010-04-25 Coorporate Challendge
2010-04-27
  • Post race meeting.
  • Decide on work todo for rest of year.
  • Scaletrix night !
2010-05-04
  • Car horn PCB. (DD,GB + TB)
  • Aerodynamics testing. Get some ideas. Try new designs in VWT over following weeks. (GB, Anyone else? + TB)
  • Fix battery trolly.
  • Fix dodgy battery number sensor wire. (Anyone? + TB)
  • Build desulphation unit into box. (Drilling holes, bolting parts and soldering). (Anyone? + TB)
  • Sponsership letters, (Townsland trust ?)
  • Write up CC race report.
2010-05-11  
  • Car horn PCB. (DD + TB)
  • Aerodynamics testing. New Pro/Engineer RR8 model. Try new designs in VWT over following weeks. (GB, Anyone else? + TB)
  • Fix battery trolly.
  • Fix dodgy battery number sensor wire. (Anyone? + TB)
  • Build battery heater thermostats and fit into boxes. (Drilling holes, bolting parts and soldering). (TA,DB + TB)
  • Fit GPS Unit into car (JA, KA)
  • Weigh drivers.
  • Coating of car parts. (ST,IM)
  • Find GPS coordinates for Goowood/Castle Combe with directions (JA, KA)
  • Write up CC race report.
2010-05-18
  • Car horn PCB. (DD + TB)
  • Aerodynamics testing. New Pro/Engineer RR8 model. Try new designs in VWT over following weeks. (GB, Anyone else? + TB)
  • Rolling Resistances testsReduce steering bar length so drivers will fit.
  • Video
2010-05-25
  • Report on AeroDynamic improvements
  • Car horn PCB. (DD + TB)
  • Fit GPS Unit into car (JA, KA)
  • Weigh drivers.
  • Shorten steering joystick length
  • Fix dodgy battery number sensor wire. (Anyone? + TB)
2010-06-01  Holiday
2010-06-01

Terrys House

  • Shorten steering joystick length
  • Make new rear panels
2010-06-03

Martins House

  • Make new rear panels and finish off
2010-06-08
  • Driver area mods
  • New screen
  • Car horn PCB. (DD + TB)
  • Battery heaters, finish boxes and install into battery boxes
  • Fit Video Camera to car
  • GPS co-ordinates
2010-06-15  
  • Safety checks
  • Test around tennis courts
  • Kit check
  • Pit-stop practice
  • Driver check/ logbooks.
2010-06-20 Central Southern
2010-06-22
  • Car horn PCB. (DD + TB)
  • GPS aerial move
  • Banner, aerial
  • Better fitting of Video Camera to car
  • GPS co-ordinates, Castle Combe
2010-06-27 Castle Coombe
2010-06-29
  • Post race meeting
  • Roll investigation
  • Tilt tests
  • Check car over
  • Fix up car for Rolls Royce show
2010-07-06
  • No Greenpower at school
  • Scaletrx and BBQ
2010-07-13
  • Take out roll bar
  • Take off foam sides
  • Car horn
  • Aerodynamics, any body shape changes
  • Purchase plywood for new wheel covers
  • Choose wheel components
  • Cut out new foam fixing plywood panels
  • (If we have foam begin shaping it)
2010-07-20
  • Bend/weld roll-bar
  • Lace wheels
  • Start tightening wheels
  • Cut to shape foam sides
  • Fit plywood holding panels (60mm x 60mm x 6mm) to sides
  • Start to shape sides
  • Start making new wheel covers
  • Might need to lathe wheel centre bosses
  • Change steeing ratio
 

Summer Holidays

  • Build Wheels
  • Shape sides
  • Finish wheel covers
  • Paint sides
2010-09-07
  • Steering rod covers
  • The horn box thing is hanging ?
  • Fit all body panel screws
  • Roll bar needs fitting & plywood surround needs re-doing.
  • New rear rollbar strut.
  • Refit isolater switch
  • Check wheel dish against body sides
  • Cut out wheel covers
  • May need to alter the battery door supports
  • Measure wheel circuference and calculate gearing (Dusfold like circuit at 15 Amp).
  • Organise stickers needed.
 

Terrys/Martins house

  • Paint the foam
  • Glue wheel covers and paint
  • Fit wheel covers
2010-09-14
  • Refit Brake discs, drive gear and speedo magnet
  • Fit new rollbar aerofoils
  • Ariel needs mounting on the car
  • Driver talk on Merryfield
  • Fit stickers
  • Check car over
  • Test car
  • If possible, new behind head fairing and behind helmet foam
 

Terrys/Martins house

  • Fit wheel covers
  • Check car over
  • Set gearing
2010-09-19 Somerset Regional heat
2010-09-21
  • New Driver around tennis court driving.
  • Look for replacement batteries.
  • Rolling resistance test.
  • Round edges on steering plates and check for steering catching as reported by James.
  • Car horn.
  • Download Video Camera footage
  • Write up race report on web site.
2010-09-26 Dunsfold Park
2010-09-28
  • Clean car !
  • Rolling resistance test or Kojak tyres.
  • Check joystick position with all drivers. Might have to move joystick 3cm further forward.
  • Start making new behind head bit.
  • Work out gearing needed.
  • Car horn, re-glue box different speaker protection, separate batteries ?
  • Download Video Camera footage
  • Write up race report on web site.
2010-10-05
  • Move joystick 2cm ? further forward
  • Improve behind driver foam pad for smaller drivers
  • Remake behind head foam and rear fairing
  • Write up race report on web site.
  • New gear
2010-10-12
  • Drill and ream new 22 tooth cog.
  • Look at behind helmet foam.
  • Look at behind driver foam for smaller drivers and extra behind head foam.
  • Car horn wiring and foam suround.
  • Front wheel tracking
  • Steering cover plates
  • Stickers
  • Race tatics
 2010-10-17 National Final

Mid Season Ideas

Priority 1

Priority 2

Priority 3

Ideas

ToDecide

Start of season ideas

Ideas for improvements to existing car

Priority 1

Priority 2

Priority 3

New

Others

ToDecide