Rotary Racer 8/9: Todo List 2011 - 2012

Ideas for new car:

RR8: Todo

  • Modify brakes to use dual brake cables.
  • Fix mirror.
Date Description
 7/11/2011
  • Meeting on what to do
  • Weighing car bits
  • Looking at new rules
 14/11/2011
  • Weighing car bits
  • Looking at new car shapes
  • Researching new brake lever
  • Pictures for sponsors
  • Tidy up Greenpower room
 21/11/2011
  • Windtunnel
  • Cleaning up car for RedBull event
  • Improving noticeboard for RedBull event
 28/11/2011
  • Training on using 3D CAD/CAM
  • Looking at new car shapes
  • Putting old tyres on for RedBull event
  • F24+ starting development/work plan
  • Improving noticeboard for RedBull event
 4/12/2011 Greenpower social evening
 5/12/2011
  • Meeting to partition work
  • Which races to enter
  • Funding
  • F24+ starting development/needed/work plan (Present to rest of team this week/next week ?
  • Look at other cars competing
  • Make list of work todo for existing car
  • Make list of ideas for new car
  • Car weight results
  • Update Todolist with all Greenpower evening dates (show holidays)
  • Update website
  • Brake lever look at purchasing
 12/12/2011  
  • Try welding Aluminium
  • Setting up for new motor speed controller tests
  • Which races to enter
  • Funding
  • F24+ starting development/needed/work plan (Present to rest of team this week/next week ?
  • Look at other cars competing
  • Car weight results
  • Update Todolist with all Greenpower evening dates (show holidays)
  • Update website
  • Brake lever look at purchasing
 9/1/2012
  • Funding
  • Start modifing brakes to use dual brake cables.
  • Start building thermostatic heaters for RR+.
  • Start building battery boxes for RR+.
  • Update Todolist with all Greenpower evening dates (show holidays)
  • Think about new cars design.
 16/1/2012  
 12/3/2012
  • VWT Simulations
  • Car design
  • Front brakes dual cable fitting
  • Replace mirror
  • Funding
 19/3/2012
  • Rotary Club visit
  • Get car back together for test day
  • VWT simulations
  • Overal logos for Rotary Club event
 26/3/2012
  • Fit 70Amp fuse
  • Check car over
  • Test on tenis courts
  • VWT Simulations
  • Car design
27/3/2012 Goodwood, Testday
16/4/2012
  • Display boards for Rotary Club festival
  • RR9 design work
  • Small meeting on way ahead
  • Take car bits for Rotary Club festival
 22/4/2012 Rotary Club festival
23/4/2012
  • Fill in driver forms
  • Fit race tytes
  • Check and adjust front wheel tracking
  • Fit Car computer loging SDCARD and test electronics
  • F24+: Plan: purchase batteries, races, battery testing, gearing
  • Battery box insulation
  • Check all bits to take for Silverstone
29/4/2012 Silverstone
 30/4/2012
  • Post race meeting
  • Checking car over, letting down tyres.
  • Retreiving data logs
  • New battery leads, getting bits
  • Updating website ans race report
  • Calibrating thermostats
 7/5/2012  Bank Holiday
14/5/2012
  • Look to see what gearing range we can handle without changing the chain. Measure motor movement and calculate motor movement needed for gear changes (maths !).
  • New speed controller PCB tracking
  • Making up F24+ battery leads
  • CAD side and top printouts for RR9
  • F24+ Battery boxes finishing
  • Greenpower display panel setup
  • Sponsor thankyou letters, signing them
  • Modifying battery test system for F24+
21/5/2012
  • New speed controller PCB tracking
  • Adding new motor adjustment arm to allow greater range of gears to be used for F24+
  • F24+ battery discharge tests
  • F24+ battery initial cycling
  • Telemetry Laptop software changes for F24+
28/5/2012
  • Building new speed controller (Soldering components)
  • Building inductors for new speed controller (air core and powerderd iron core)
  • Telemetry Laptop software changes for F24+
  • Modifying thermostats for 25 degree C operation.
  • Fitting new chain and checking new motor adjustment arm with larger gears for F24+
  • F24+ battery initial cycling
3/6/2012
  • Fitting and testing new speed controller
  • Checking tyres
  • Getting bits ready for race
  • Drivers meeting
10/6/2012 Goodwood
11/6/2012
  • Post race meeting
  • New car design work
9/7/2012
  • Checking car over
  • Drivers meeting
  • New car design work
16/7/2012 Rockingham
10/9/2012
  • Start of new season meeting
  • Drivers meeting for Castle coome
  • Checking car over
  • Speed controller efficiency tests
  • New car design work
15/9/2012 Merryfield
17/9/2012
  • Post race meeting
  • Fit new motor
  • Clean out car
  • Replace chain
  • Pitstop practice
  • Drivers meeting for Castle coome
  • New car design work
24/9/2012
  • Try out new 25 tooth gear
  • Drill/ream out new 24 tooth gear.
  • Complete motor fitting.
  • Put car back together
  • Fit two new rear tyres.
  • Test motor speed controller efficiency.
  • Pit-Stop practice
  • New tyres
  • Drivers doing driver order
  • New car design work
27/9/2012

School Open Day

  • Work on car getting new motor installation done and speed controller re-fitted.
  • Refit car sides
30/9/2012 Castle Coombe
1/10/2012
  • Post race meeting
  • Pit-Stop practice
  • Checking car over
  • New battery testing
  • Add silver foil to battery box lids
8/10/2012
  • Make cable for new batteries (which way round do they fit ?)
  • Add strap and handles to new batteries.
  • Modify MotorSpeed controller with I2C resistors.
  • Add silver foil to battery box lids
  • Make battery heating panel.
  • Fix Aerial
  • Glue rubber on tail piece
  • Check over car
  • Pitstop practice, driver order etc
  • Put up Final information on school GP notice board
  • Check noticeboard for final
  • F24+ gearing decide
  • Pick up Shield

Needed:
Some nylon rope (3mm diameter ?)
Webbing for battery pull out
Battery leads and connectors (have ordered these)
14/10/2012 Goodwood final